Availability and Profit Analysis of 3-out-of-4 Repairable System with Preventive Maintenance

Authors and Affiliations

  • Ibrahim Yusuf Bayero University, Kano, Nigeria

About this article

Download PDF

Abstract

Studies on two unit repairable standby system dealing with availability and profit analysis involving preventive maintenance are numerous. However little attention is paid on the study of evaluation of reliability characteristics such as availability, busy period and profit function of multi component system such as 3-out-of-4 system involving four types of failures . In this paper, we studied the availability and profit analysis of a repairable redundant 3-out-of-4 system with preventive maintenance involving four types of failures and  develop explicit expressions for steady-state availability and profit function for the system using Chapman-Kolmogorov equations. Some particular cases have also been obtained analytically and graphically to see the impact of preventive maintenance on some system measures of effectiveness .Certain important result have been evaluated as special cases. Results have shown that system with preventive maintenance is better in terms of system effectiveness than system without preventive maintenance.

Author Biography

  • Ibrahim Yusuf, Bayero University, Kano, Nigeria

    Department of Mathematical Sciences

    Lecturer II

References

[1] Bhardwj, R.K. and Chander, S. (2007). Reliability and cost benefit analysis of 2-out-of-3 redundant system with general distribution of repair and waiting time. DIAS- Technology review- An Int. J. of business and IT. 4(1), 28-35

[2] Chander, S. and Bhardwaj, R.K. (2009). Reliability and economic analysis of 2-out-of-3 redundant system with priority to repair. African J. of Maths and comp. sci, 2(11), 230-236.

[3] Bhardwj,R.K., and S.C. Malik. (2010). MTSF and Cost effectiveness of 2-out-of-3 cold standby system with probability of repair and inspection. Int. J. of Eng. Sci. and Tech. 2(1), 5882-5889

[4] Wang., k. Hsieh., C. and Liou, C (2006). Cost benefit analysis of series systems with cold standby components and a repairable service station. Journal of quality technology and quantitative management, 3(1), 77-92

[5] El-Said, K.M.,. (2008).Cost analysis of a system with preventive maintenance by using Kolmogorov’s forward equations method. American Journal of Applied Sciences 5(4), 405-410

View more references (4)

[6] Haggag, M.Y., (2009). Cost analysis of a system involving common cause failures and preventive maintenance. Journal of Mathematics and Statistics 5(4), 305-310

[7] Haggag, M.Y., (2009). Cost analysis of k-out-of-n repairable system with dependent failure and standby support using Kolmogorov’s forward equations method .Journal of Mathematics and Statistics 5(4), 401-407.

[8] Wang, K.H and Kuo, C.C. (2000). Cost and probabilistic analysis of series systems with mixed standby components. Applied Mathematical Modelling, 24, 957-967

[9] Wang, K.C., Liou, Y.C, and Pearn W. L. (2005). Cost benefit analysis of series systems with warm standby components and general repair time. ,Mathematical Methods of operation Research, 61, 329-343.


How to Cite

Yusuf, I. (2012). Availability and Profit Analysis of 3-out-of-4 Repairable System with Preventive Maintenance. International Journal of Applied Mathematical Research, 1(4), 510-519. https://doi.org/10.14419/ijamr.v1i4.345