Performance Monitoring Office of Financial Management And Asset Majalengka of Indonesia

Authors and Affiliations

  • Wawa Wikusna
  • Haris Y Yuniarsa
  • Bella Rahmatika Damayanti

About this article

Download PDF

Keywords:

The work program, the work unit, web-based application, performance, Waterfall

Abstract

Each the work unit in the Department of Finance and Asset Management (DPKAD) Majalengka in Indonesia required to have a work program that is made in the form of scheduled activities planned, directed, integrated, and scalable to guide the implementation of the work in one fiscal year. In order for the implementation of the work program in accordance with the target, it is necessary to control and supervision of the planning, evaluation, and reporting DPKAD Majalengka. All long, monitoring the implementation of the work program only based on documents submitted activity reports after the event is completed. There is no control and early warning to employees about the schedule of activities, so many activities that late in implementation. Measurement of program performance work the work unit is difficult because basih shaped paper based reports. This research was conducted to develop a web-based application monitoring the performance of the Department of Finance and Asset Management (DPKAD) Majalengka in Indonesia. Applications built using Software Development Life Cycle with the waterfall model, using the programming language PHP framework CodeIgniter, MySQL database, and it is equipped with SMS broadcast. Hopefully, with this application is expected data management work program, including data proposed work programs, the control of the implementation schedule of activities, reporting on the implementation activities and outcomes measurement program can work better quality

References

[1] Erastus Y., Emmanuel. PhD (Can.). (2014). Monitoring Employee Performance at the Workplace. Developing Country Studies, ISSN 2224-607X

(Paper) ISSN 2225-0565 (Online), Vol.4, No.14, www.iiste.org.

[2] Yerby, Johnathan. (2013). Legal and ethical issues of employee monitoring, Online Journal of Applied Knowledge Management, Volume 1, Issue2.

[3] Elnaga, Amir., Imran, Amen. (2013). The Effect of Training on Employee Performance, European Journal of Business and Management, ISSN

2222-1905 (Paper) ISSN 2222-2839 (Online), Vol.5, No.4.

View more references (5)

[4] Chinyere N., Ikonne. & Chiemela, Ikonne. (2014). Workplace E-Monitoring and Surveillance of Employees: Indirect Tool of Information Gathering, International Journal of Science and Research (IJSR), ISSN (Online): 2319-7064, Volume 3 Issue 10, www.ijsr.net.

[5] Muktiali, Mohammad. (2009). Penyusunan Instrumen Monitoring Dan Evaluasi Manfaat Program Pembangunan di Kota Semarang, Riptek, 3(2),

11-20.

[6] DPKAD, (2012). Dinas Pengelolaan Keuangan dan Aset Daerah Kabupaten Majalengka.

[7] Sommerville, Ian. (2011). Software Engineering. Pearson. 9t


How to Cite

Wikusna, W., Yuniarsa, H. Y., & Rahmatika Damayanti, B. (2026). Performance Monitoring Office of Financial Management And Asset Majalengka of Indonesia. International Journal of Engineering and Technology, 8(1.9), 693-697. https://doi.org/10.14419/ijet.v8i1.9.30089