Implementation Framework of Advanced Planning and Scheduling System for Smart Manufacturing in SMEs

  • Authors

    • Jae-yong Lee
    • Moonsoo Shin
    https://doi.org/10.14419/ijet.v7i3.24.22839
  • APS (advanced planning and scheduling), SMEs (small and medium-sized enterprise), Production data, Simulation, Smart factory.
  • Background/Objectives: Small and medium-sized manufacturing enterprises (SMEs) are usually unable to properly respond to the rapid changes in the production environment.

    Methods/Statistical analysis: We propose an implementation framework of advanced planning and scheduling (APS) system specialized for SMEs. The following are considered as the main factors in implementation of APS system: 1) establishment of on-site production data collection and management system for SMEs with poor IT infrastructure, 2) establishment of production scheduling system linking experiential knowledge of field production manager, and 3) construction of various scenario analysis system using simulation technique.

    Findings: The proposed APS system can collect and manage the production data generated at the manufacturing site. Various production data can be stored, and realistic scheduling can be established according to actual situation of the site. Second, scheduling can be established in connection with the experiential knowledge of field managers. Using a technique for order or preference by similarity to ideal solution (TOPSIS) based approach, it is possible to select the optimal work priority assigned to the manager's empirical weight, and it is possible to make quick decision-making and rescheduling in various situations. Third, the simulation function is installed, and it is possible to analyze the forecasted scenario in terms of the productivity through the simulation result index.

    Improvements/Applications: It is expected to contribute to the establishment of smart production of SMEs by efficiently managing the production data at low cost and improving the system utilization.

     

     

  • References

    1. [1] Park, M. (2018). A study on the development of material allocation scheduling system for implementing smart factory (Masters dissertation). Myongji University, Seoul, Korea. Retrieved from http://www.riss.kr/link?id=T14743216.

      [2] Kang, H., Lee, J., Choi, S., Kim, H., Park, J., Son, J., Kim, B., & Noh, S. (2016). Smart manufacturing: past research, present findings, and future directions. International Journal of Precision Engineering and Manufacturing-Green Technology, 3(1), 11-128.

      [3] Moon, J. (2018). Development of a competency framework for intelligent factory and smart manufacturing in industry 4.0 (Masters dissertation). Dongguk University, Seoul, Korea. Retrieved from http://www.riss.kr/link?id=T14710848.

      [4] Musselman, K., O’Reilly, J., & Duket, S. (2002). The role of simulation in advanced planning and scheduling. Proceedings of the 2002 Winter Simulation Conference, 1825-1830.

      [5] Lim, S., & Shin, Y. (2007). Advanced planning and scheduling (APS) system implementation for semiconductor manufacturing: a case at Korean semiconductor manufacturing company. IE interfaces, 20(3), 277-287. Retrieved from http://www.riss.kr/link?id=A60282538.

      [6] Lee, J. (2015). A study on lead-time reduction based on advanced planning and scheduling (APS) system (Masters dissertation). Hanbat National University, Daejeon, Korea. Retrieved from http://www.riss.kr/link?id=T13688181.

      [7] Oh, S. H. (2018). Realization of smart factory management environment of SMEs (Masters dissertation). Hanyang University, Seoul, Korea. Retrieved from

      http://www.riss.kr/link?id=T14541422.

      [8] Shin, M., Bae, S., Choi, S., & Lee, H. (2013). Development of dispatching rule-based production scheduler for small and medium sized manufacturing company. Proceedings of the 2013 Korean Society of Manufacturing Technology Engineers Conference, 335-335. Retrieved from

      http://www.riss.kr/link?id=A99799952.

      [9] Han, S., Jeun, S., Kim, H., Park, J., Lee, J., & Kang, K. (2014). Development of scheduler and simulator for reconfigurable manufacturing system. Proceedings of the 2014 Korean Society of Mechanical Engineers Conference, 198-199. Retrieved from

      http://www.riss.kr/link?id=A99972234.

      [10] Nam, S., Ju, S., Lee, D., Ryu, C., & Shin, J., (2016). A study on APS development for shipbuilding production planning process. Proceedings of the 2016 CAD/CAM Conference, 191-196. Retrieved from http://www.riss.kr/link?id=A101826222.

      [11] Joo, C. (2004). A study on the development of an APS system for job shops. Proceedings of the 2004 Korean Institute of Industrial Engineers Spring Conference, 64-66. Retrieved from

      http://www.riss.kr/link?id=A60275878.

      [12] Lee, J., Kim, S., Park, S., Shin, M., & Cho, Y. (2015). Design of S-PMS (production management system for SMEs) based on dispatching rule-driven simulation model. Proceedings of the 2015 Korea Industrial and System Engineering Fall Conference, 20-28. Retrieved from

      http://www.riss.kr/link?id=A101430381.

      [13] Lee, J., & Moon, D. (2014). Architecture for developing simulation-based scheduler considering changes of takt time and number of work stations. Journal of the Korean Society of Supply Chain Management, 14(2), 65-75. Retrieved from http://www.riss.kr/link?id=A100214189.

      [14] Hwang, D., Nam, S., Cho, Y., Oh, S., Na, S., & Kang, K., (2012). A study on the process design of advanced planning & scheduling for transformer operation improvement. Journal of the Korea Safety Management & Science, 14(2), 159-166. Retrieved from http://www.riss.kr/link?id=A60126645.

      [15] Kim, Y., Lee, H., So, B., Lee, Y., & Park, J. (2013). Development of KPI by simulation-based APS. Proceedings of the 2013 Korean Society for Simulation Fall Conference, 172-176. Retrieved from http://www.riss.kr/link?id=A101784876.

      [16] Han, S., & Shin, M. (2015). Timing constraints propagation-based production scheduling for small and medium-sized manufacturing company. Proceedings of the 2015 Korean Institute of Industrial Engineers Joint Spring Conference, 1299-1303. Retrieved from http://www.riss.kr/link?id=A100471067.

  • Downloads

  • How to Cite

    Lee, J.- yong, & Shin, M. (2018). Implementation Framework of Advanced Planning and Scheduling System for Smart Manufacturing in SMEs. International Journal of Engineering & Technology, 7(3.24), 671-675. https://doi.org/10.14419/ijet.v7i3.24.22839