Application of The MODAPTS Method with Innovative Solutions in The Cement Packing Process
DOI:
https://doi.org/10.14419/ijet.v7i2.11249Published
08-04-2018Keywords:
MODAPTS, Operator's Movement, Movement Activities, Terminal Activities, Standard Time, Normal TimeAbstract
The Modular Arrangement of Predetermined Time Standard (MODAPTS) is a medote for analyzing performance in performing work by monitoring the operator's movement in the workplace. MODAPTS will record the movement of each carrier in the workplace. This research will reveal a number of common features of MODAPTS and its applications in the packing process at the cement plant in particular to reduce the waste of working time that causes the production target is not achieved. This Cement Packing process becomes the chosen workplace because it requires manual work where there is continual movement of the body. The suggested improvement is in the form of determining movement activities, terminal activities, and Auxiliary Activities for each operator based on the standard time and the normal time available. Based on the results of this study obtained innovative solution that can be used as a safe, easy, and efficient working procedure resulting in increased work productivity.
References
Heyde G C C (1966), MODAPT Plus. Heyde Dynamics Pty Ltd
International MODAPTS Association, Inc. Kalamazoo, Ml: MODAPTS http://www.modapts.org/bylaws.htm, 25.05.2012
Brnada S, Sabaric I & Kovacevic S (2010), Application of MODAPTS Method in The Warping Process. Proceedings of the 4th International Conference ERGONOMICS, 143-150
Karger D W & Bayha F H (1987), Engineering Work Measure-ment. Industrial Press Inc., New York
Hirano H (1996), 5 Pillars of The Visual Workplace. Productivity Press Inc., Portland
Kobayashi I (1996), Material, Notes and Papers. PPORF Devel-opment Institue, Japan
Cho H J & Park J I (2012), Methodology of Estimating Assem-bly Cost by MODAPTS. International Journal of Information and Communication Engineering 6(3), 544-548
Cho H J, Lee S & Park J I (2014), Time Estimation Method for Manual Assembly Using MODAPTS Technique in The Product Design Stage. International Journal of Production Research 52(12), 3595-3613
Golpra H (2013), Estimation Duration of Projects Manual Tasks Using MODAPTS Plus Method. Int. J. Research in Industrial Engineering 2(1), 12-19
Wu S, Wang Y, BolaBola J Z, Qin H, Ding W & Wen W (2016). Incorporating Motion Analysis Technology into Modular Ar-rangement of Predetermined Time Standard (MODAPTS). Inter-national Journal of Industrial Ergonomisc 53, 291-298
Razmi J & Niyaee S (2008), Developing a Spesific Predeter-mined Time Study Approach: An Empirical Study in a Car In-dustry. Prod. Plan. Control Manag. Operations 19(5), 454-460
Cho H J & Park J I (2014), Motion-Based Method for Estimating Time Required to Attach Self-Adhesive Insulators. Computer-Aided Des 56(11), 68-87