[1]
M. Houti, L. E. Abbadi, and A. Abouabdellah, “How Could an Urgent Order Disturb the Supply Chain? Case Study of an Automotive Industry”, IJET, vol. 7, no. 4.16, pp. 155–159, Nov. 2018, doi: 10.14419/ijet.v7i4.16.22875.