Pour, N.S., Zeynali, S. and Kheradmand, M. (2012) “Calculating the Fuzzy Project Network Critical Path”, International Journal of Engineering & Technology, 1(2), pp. 58–66. doi:10.14419/ijet.v1i2.43.