Joseph Kalayathankal, S., Varghese Kureethara, J. and T. Abraham, J. (2018) “A modified fuzzy approach to prioritize project activities”, International Journal of Engineering & Technology, 7(2.6), pp. 158–162. doi:10.14419/ijet.v7i2.6.10143.