J, Rajprasad, Thamilarasu V, and C Lokesh Kumar Reddy. 2018. “A Study on Multiple Crew Based Productivity Scheduling Method in Construction Projects”. International Journal of Engineering & Technology 7 (2.12): 454-58. https://doi.org/10.14419/ijet.v7i2.12.11516.