[1]
Houti, M. et al. 2018. How Could an Urgent Order Disturb the Supply Chain? Case Study of an Automotive Industry. International Journal of Engineering & Technology. 7, 4.16 (Nov. 2018), 155–159. DOI:https://doi.org/10.14419/ijet.v7i4.16.22875.