Rational Combination of Capital Mining and Construction Mining Operations in Coal Cuts

  • Authors

    • Sergey Igorevich Fomin
    • Vladimir Viktorovich Ivanov
    • Do Ngoc Hoan
    2018-12-03
    https://doi.org/10.14419/ijet.v7i4.38.27654
  • coal open-cut, capital mining operations, construction mining operations, construction of mines, mining and transport equipment, mining block, deposit.
  • The purpose of the construction of a coal open-cut should be an achievement in the shortest possible time of an access to the mineral deposit and creation of favorable mining conditions for achieving the specified performance. In the con-text of investment restrictions during the construction of the mine, the volume of preparatory work should be minimized (preparation of the surface of the quarry field, organization of the field drainage system, creation of a system of tracks, construction of installation sites, power lines, electrical substations, warehouses, and other infrastructure facilities).

    The main reason for the failure to comply with the deadlines for the commissioning of coal mines is the un-preparedness of the mining front, so the priority in determining the sequence of putting infrastructure facilities into operation is their influence on the development of the mining front.

    Justification of the sequence of input of mining sites in the development should be carried out based on the analysis of mining and geological conditions, as well as take into account the location of mining sites relative to the systems of transport and energy communications.

    The creation of the necessary infrastructure should be carried out in stages with the transfer of costs to the later periods of operation of the mine, when conditions for reinvestment from the company's profits will be created.

     

     

  • References

    1. [1] Anistratov, Yu.I., Tekhnologiya otkrytykh gornykh rabot [Open-Pit Mining Technology], Nedra, Moscow, 2009.

      [2] Arsentiev, A.I., Bukin, I.Yu., Mironenko, V.A., Ustoichivost bortov i osushenie karerov [Stability of Boards and Drainage of Quarries], Nedra, Moscow, 1982.

      [3] Arsentiev, A.I., Razrabotka mestorozhdenii tverdykh poleznykh iskopaemykh otkrytym sposobom [Open-Pit Mining Development of Solid Mineral Deposits], RIC SPGGI, St. Petersburg, 2010.

      [4] Arsentiev, A.I., Dialogi o gornoi nauke [Dialogues on Mining Science], RIC SPGGI, St. Petersburg, 1999.

      [5] Arsentiev, A.I., Kholodnyakov, G.A., Proektirovanie gornykh rabot pri otkrytoi razrabotke mestorozhdenii [Design Of mining in Open-Pit Mining Technology], Nedra, Moscow, 1994.

      [6] Arsentiev, A.I., Proizvoditelnost karerov [Opencast Mine Output], St. Petersburg Mining Institute, St. Petersburg, 2002.

      [7] Arsentiev, V.A., Berezova, V.L., Organizatsionno-ekonomicheskie aspekty investitsionnoi deyatelnosti v gornoi promyshlennosti Rossii [Organizational and Economic Aspects of Investment Activity in the Mining Industry of Russia]. Gornyi zhurnal, 10, (2000) 21-24.

      [8] Camus, J.P. (2002). Management of Mineral Resources: Creating Value in the Mining Business (pp. 17-25). Soci-ety for Mining, Metallurgy, and Exploration. (p. 268).

      [9] Varshavsky, V.E., Kovalenko, V.S., Aktualnye voprosy stroitelstva moshchnykh burougolnykh razrezov [Relevant Issues of Building Powerful Brown Coal Open-Pit Mines], Gornyi informatsionno-analiticheskii byulleten, 2 (2002) 57-60.

      [10] O'Hara, T.A., Quick Guides to the Evaluation of Ore Bodies, Bulletin of the Canadian Institute of Mining and Metallurgy, 73 (1991) 87-99.

      [11] Peshkov, A.A., Matsko, N.A., Dostupnost mineralno-syrevykh resursov [Mineral Resources Availabil-ity], Nauka, Moscow, 2004.

      [12] Reentovich, E.I., Obosnovanie optimalnykh reshenii dlya otkrytykh razrabotok [Rationale for Optimal Solutions for Open Source Mining], Nauka, Moscow, 1982.

      [13] Rudawsky, O., Economic Evaluation Techniques for Mining Investment Projects, Colorado School of Mines Mining Industries Bulletin, 14(1) (1971) 15-19.

      [14] Fomin, S.I., Proizvoditelnost karerov i spros na mineralnoe syre [Productivity of Opencasts and Demand for Mineral Raw Materials], Tema, St. Petersburg, 1999, 33-39.

      [15] Fomin, S.I., Kava, P.B., Otsenka effektivnosti investirovaniya otkrytoi razrabotki slozhnostrukturnykh mestorozhdenii [Assessment of the Effectiveness of Investment in Open-Ended Development of Complex-Structured Deposits], Gornyi informatsionno-analiticheskii byulleten, 5, (2011) 312-316.

      [16] Fomin, S.I., Vedrova, D.A., Doan Van Thanh, Organizatsiya otkrytoi razrabotki mestorozhdenii gruppoi karerov [The Organization of Opencast Mining by a Group of Quarries], Marksheideriya i nedropolzovanie, 3 (2013) 44-49.

      [17] Fomin, S.I., Vedrova, D.A., The Mining Technology of a Thick Overburden Layer Covering a Group of Flat Dipping Coal Seams. In C. Drebenstedt, & R. Singhal (Eds.), Mine Planning and Equipment Selection: Pro-ceedings of the 22nd MPES Conference, Dresden, Germany, 14th-19th October 2013 (Vol. 1, pp. 75-81). Dresden, Germany: Springer.

      [18] Hustrulid, W.A., Kuchta, M.E., Open Pit Mining Planning and Design, CRC Press, 2006.

      [19] Schadov, V.M., Otkrytaya razrabotka slozhnostrukturnykh ugolnykh mestorozhdenii Vostochnoi Sibiri i Dalnego Vostoka [Open-Pit Mining of Complex-Structured Coal Deposits in Eastern Siberia and the Far East], MGGU, Moscow, 1998, 56-59.

      [20] Ho Si Giao, Bui Xuan Nam, Nguyen Anh Tuan, Open-Cut Methods for Mining Solid Mineral, Science and Technics Publishing House, Hanoi, Vietnam, 2009.

  • Downloads

  • How to Cite

    Igorevich Fomin, S., Viktorovich Ivanov, V., & Ngoc Hoan, D. (2018). Rational Combination of Capital Mining and Construction Mining Operations in Coal Cuts. International Journal of Engineering & Technology, 7(4.38), 1118-1121. https://doi.org/10.14419/ijet.v7i4.38.27654