Macroeconomic Risk Factor in Fuzzy Present Value of Highway Development

  • Authors

    • Siti Salihah Shaffie
    • Saiful Hafizah Jaaman
    • Daud Mohamad
    2018-12-09
    https://doi.org/10.14419/ijet.v7i4.33.23487
  • Fuzzy cash flow, Fuzzy number, Fuzzy present value, Risk assessment.
  • Highway developments are the backbone for the society and economic growth. It is part of the capital investment in infrastructure developments that require high spending, long term commitment and prognosticated with numbers of risks. This is because the investment is associated with uncertainty and vagueness due to long term duration of construction and operation of the project. Hence, the valuation of the investment requires accommodated model to present more accurate estimation of the project. This study proposed to evaluate fuzzy present value of a highway project with anticipated risk assessment in its valuation using fuzzy present value. The risk assessment is part of the estimation of fuzzy cash flow to represent better present value of the project. The results show an estimated value comprise with risk assessment of macroeconomic factor to portray better estimation that can assist decision maker to make decision towards the project.  

     

  • References

    1. [1] Raja, K A R A K (2012), Malaysia’s BOT Method Implementation For Highway Development Projects, Ritsumeikan Asia Pasific University.

      [2] Bakri A, Saidan Khaderi S & Abd AS (2009), Risk Management in Build-Operate-Transfer (BOT) for Roads and Highway Projects in Malaysia, Built Environ. J. 6(1), 1–11.

      [3] Sarvari H, Valipuor A & Yahaya N (2014), Risk Ranking of Malaysian Public Private Partnership Projects, Appl. Mech. Mater. 567, 613–618.

      [4] Cooper DF, Grey S, Raymond G & Walker P (2005), Managing Risk in Large Projects and Complex Procurements. John Wiley and Sons.

      [5] Xu Y, Yeung JFY, Chan APC, Chan DWM, Wang SQ & Ke Y (2010), Developing a risk assessment model for PPP projects in China-A fuzzy synthetic evaluation approach, Autom. Constr. 19(7), 929–943.

      [6] Ebrahimnejad S, Mousavi SM & Seyrafianpour H (2010), Risk Identification and Assessment for Build-Operate-Transfer Projects: A Fuzzy Multi Attribute Decision Making Model, Expert Syst. Appl. 37(1), 575–586.

      [7] Ezanee F & Ghazali M (2010), Operational Risks for Highway Projects in Malaysia, Int. J. Hum. Soc. Sci. 5(1), 22–25.

      [8] Buckley JJ (1987), The Fuzzy Mathematics of Finance, Fuzzy Sets Syst. 21(1), 257–273.

      [9] Yao JS, Chen MS & Lin HW (2005), Valuation by Using a Fuzzy Discounted Cash Flow Model, Expert Syst. Appl. 28, 209–222.

      [10] Wiesemann W, Kuhn D & Rustem B (2010), Maximizing the Net Present Value of a Project Under Uncertainty, Eur. J. Oper. Res. 202(2), 356–367.

      [11] Tsao CT (2012), Fuzzy Net Present Values for Capital Investments in an Uncertain Environment, Comput. Oper. Res. 39(8), 1885–1892.

      [12] Dixit AK & Pindyck RS (1994), Investment Under Uncertainty. Princeton University Press.

      [13] Zadeh LA (1965), Fuzzy Set, Inf. Control 8, 338–353.

      [14] Chiu C & Park CS (1994), Fuzzy Cash Flow Analysis Using Present Worth Criterion, Eng. Econ. 39(2), 37–41.

      [15] Dubois D, Foulloy L, Mauris G & Prade H (2004), Probability-Possibility Transformations, Triangular Fuzzy Sets, and Probabilistic Inequalities, Reliab. Comput. 10, 273–297.

  • Downloads

  • How to Cite

    Salihah Shaffie, S., Hafizah Jaaman, S., & Mohamad, D. (2018). Macroeconomic Risk Factor in Fuzzy Present Value of Highway Development. International Journal of Engineering & Technology, 7(4.33), 71-73. https://doi.org/10.14419/ijet.v7i4.33.23487