Construction Work Cost Determination

  • Authors

    • Оlena Koba
    • Yulia Myronova
    • Volodymyr Byba
    2018-06-20
    https://doi.org/10.14419/ijet.v7i3.2.14398
  • сalculation methods, сonstruction and installation work cost, construction industry, сosts, financial statements.
  • The main Ukraine construction industry tendencies during 2010-2017 are described in the article. The order of construction and installation work formation is determined. The practical application peculiarities of cost calculations traditional and alternative methods in construction industry are considered. Based on the principles, methods and tools created a new conceptual model construction work cost determination.

     

     

  • References

    1. [1] Pavelko O.V.. “Vytraty u budivnytstvi: identyfikatsiia ekonomichnoi sutnosti. normatyvno-pravove rehuliuvannia obliku ta vidobrazhennia u zvitnostiâ€. Visnyk ZhDTU. No 4 (78). (2016). pp. 93-101 (In Ukrainian)

      [2] National (provision) accounting standard 1 "General requirements for financial reporting" // Order of the Ministry of Finance of Ukraine from 07.02.2013 number 73. [Electronic resource]. - Mode of access: http: // zakon.rada.gov.ua

      [3] Methodological recommendations for the formation of the cost of construction and installation works // Order of the Ministry of Regional Development and Construction of Ukraine dated December 31. 2010 No. 573. [Electronic resource]. - Mode of access: http://msmeta.com.ua/file/Metoduchni%20reкоменzii.pdf.

      [4] Verkhohliadova N.I.. Borodin M.O.. Nehoda A.S.. “Problema efektyvnoi sobivartosti budivelno-montazhnykh robit na suchasnomu etapi rozvytku budivelnoi industrii Ukrainyâ€. Molodyi vchenyi. No 4 (31). kviten. (2016). pp. 31-34. (In Ukrainian)

      [5] Kononova O. Ye.. Prosenko K. I.. Udoskonalennia orhanizatsii obliku vytrat budivelnoho pidpryiemstva. Naukovyi visnyk Uzhhorodskoho natsionalnoho universytetu. - Vol 6. chastyna 2.– (2016). pp. 23-27. (In Ukrainian)

      [6] Iliashenko V. A.. Yukhnovska Yu. O.. “Orhanizatsiia obliku vytrat i kalkuliuvannia sobivartosti v budivnytstviâ€. Derzhava ta rehiony. No 1. (2013). pp. 110-113. (In Ukrainian)

      [7] Davydiuk T. V.. “Metody obliku vytrat i kalkuliuvannia sobivartosti produktsii u vitchyznianykh normatyvnykh aktakh: napriamyudoskonalenniaâ€. Ekonomika: realii chasu. No1. (2016). pp. 6-13

      [8] Radchenko K.. Analiz metodiv kalkuliuvannia ta yikh zastosuvannia v riznykh haluziakh promyslovosti. Ekonomika. No 130. (2011). pp. 63-65 (In Ukrainian)

      [9] Skrypnyk M.I. “Metody obliku vytrat i metody kalkuliuvannia: sutnist i spivvidnoshenniaâ€. Mizhnarodnyi zbirnyk naukovykh prats. Vol. 2(14). pp. 202-206. (In Ukrainian)

      [10]Pyrets N.M.. Chernenko T.V.. “Metody vyznachennia sobivartosti produktsii pidpryiemstva budivelnoi haluzi v systemi upravlinskoho oblikuâ€. Ekonomichnyi prostir. No 71. (2013). pp. 231-238. (In Ukrainian)

      [11]Jianqiang Tang.. “Cost Management of Construction Project based on Activity-basedâ€. Costing International Conferenceon Civil “Materials and Environmental Sciencesâ€. Sichuan Agricultural University. Chengdu. 610000. China. (CMES 2015). - pp. 51-54.

      [12]Carolin Bahr. Kunnibert Lennerts. “Quantitative validation of budgeting method. Suggestion of a new calculation method for determination of maintenance costsâ€. Journal of Facilities Management. Vol. 8 Issue: 1. pp. 47-63.

      [13]Agnieszka LeÅ›niak. Edyta Plebankiewicz. Krzysztof Zima “Cost Calculation of Building Structures and Building Works in Polish Conditionsâ€. Engineering Management Research; Vol. 1. No. 2; (2012). pp.72 -81.

      [14]Ivanytska T.Ie. “Analiz metodiv obliku vytrat i kalkuliuvannia sobivartosti produktsii budivelnoho pidpryiemstvaâ€. Skhidna Yevropa: ekonomika. biznes ta upravlinni. Vol. 1 (01). (2016). pp. 129-134.

      [15]http://www.ukrstat.gov.ua/operativ/operativ2016/ bud/ibpvuk/ibpvuk_u/ibp_uk_bk_u.htm

      [16]http://www.ukrstat.gov.ua/operativ/operativ2014/bud/ovb/ovb_u/ovb_rik_u_bez.htm.

      [17]http://www.ukrstat.gov.ua/operativ/operativ2016/bud/bpvuk/ibpvuk_u/ibp_uk_bk_vyd_u.htm.

      [18]http://www.ukrstat.gov.ua/operativ/operativ2018/bud/ovb_reg/ovb_reg_u/ovb_reg_0218_u.htm.

      [19]http://www.doingbusiness.org/~/media/WBG/Doing Business/Documents/Annual-Reports/English/DB2018-Full-Report.pdf.

      [20]http://gtmarket.ru/news.

      [21]Vakhrushyna M. A. “Bukhhalterskyi upravlinskyi oblikâ€. Pidruchnyk dlia studentiv vuziv. yaki navchaiutsia za ekon. Spetsialnostiamy. M .: Omeha-L. (2005). 576 p.

  • Downloads

  • How to Cite

    Koba, Оlena, Myronova, Y., & Byba, V. (2018). Construction Work Cost Determination. International Journal of Engineering & Technology, 7(3.2), 169-175. https://doi.org/10.14419/ijet.v7i3.2.14398