[1]
I. Yusuf, “Availability and Profit Analysis of 3-out-of-4 Repairable System with Preventive Maintenance”, IJAMR, vol. 1, no. 4, pp. 510–519, Sep. 2012, doi: 10.14419/ijamr.v1i4.345.