[1]
Patel, M. and Vyas, D.S.R. 2025. Performance Evaluation and Site Optimization of A 5 MW Parabolic Dish CSP Plant. International Journal of Basic and Applied Sciences. 14, 5 (Sep. 2025), 743–752. DOI:https://doi.org/10.14419/qjccbx92.